WMATA Dulles
Phase 1 Extension Project

Type of System: Transit/Light Rail Traction Power

Scope of work: The project entailed eighteen locations on a traction power railway, control points and double crossovers tested and commissioned. Project started took (9) months of testing. DAI performed grounds testing, foreign current, power distribution, all locking tests, all associated static tests as well as dynamic tests. DAI had supplied (4) Engineers for the entire duration of the project. The project utilized Alstom VPI microprocessors with overlay track circuits and 5F switch machines.

Northeast Transit System

Type of System: Transit/Light Rail Traction Power

Scope of work: The project entails one of the most complex signal systems in the industry. DAI’s scope functions include the oversight of signal system modifications, pretesting and review of interlocking software as well as test procedures. The project entails over 500 system routes through the entire project.

BART

Type of System: Transit/Light Rail Traction Power

Scope of work: The project entailed the design and materials supply of a signal system. DAI’s function has included design through commissioning of the signaling system.

PORT OF LOS ANGELES PROJECT

Type of System: Transit/Light Rail Traction Power

Scope of work: The project entailed the reconstruction of the Pier. Balfour Beatty provided all of the field construction forces for the project. DAI provided construction oversight, site specific work plans and cut-over plans. DAI also performed all of the testing and commissioning of the system into services.